Gas Division
Pressure Reduction Stations
1. Design and Drawing
2. Materials
3. Steel Fabrication
4. Non-Destructive Test
5. Hydrostatic Test
6. Blasting and Pre-painting
7. Mechanical Site Erection
8. Electrical Site Erection
9. Pneumatic Test
10. Final Painting
11. Commissioning and Start up
Visit Us
10 H, 5 Ahmed Abd El-Azeem St.,El-lasilky, New Maadi, Cairo, Egypt.
Company Hours
Sun-thu: 9am – 5pm
Fri-Sat: Closed
Visit Us
10 H, 5 Ahmed Abd El-Azeem St.,El-lasilky, New Maadi, Cairo, Egypt.
Company Hours
Sun-thu: 9am – 5pm
Fri-Sat: Closed